Explain how you reached the decision. Based on your determination, develop an OSHA-compliant standard operating procedure (SOP) for workers to follow when entering the space to repair the valve. Include the citation(s) from 29 CFR 1910.146 for each step of the procedure.

Workers need to enter a below-ground, concrete-lined vault to repair a leaking valve that controls the flow of wastewater from several buildings at your plant. The opening for the pit is outdoors and secured with a 36-inch diameter manhole cover. The pit is 12 feet deep, and the walls are 6 feet x 6 feet wide. The valve is at the bottom of the vault. You opened the cover, tested the atmosphere, and found oxygen levels to be at 16%. No toxic substances were detected. After ventilating the space for 15 minutes, the oxygen reading reached 18% and remained at that level.

Address the following items: Using the flow chart in Appendix A of 29 CFR 1910.146, determine the classification of the space. Explain how you reached the decision. Based on your determination, develop an OSHA-compliant standard operating procedure (SOP) for workers to follow when entering the space to repair the valve. Include the citation(s) from 29 CFR 1910.146 for each step of the procedure. Your submission must be a minimum of two pages in length (double-spaced). Be sure to include a title page.

Following steps 1-11 of the Hazard Analysis and Risk Assessment Guide in the course textbook (pp. 171-174), develop a risk assessment for a serious workplace hazard with which you are familiar, or use Addendum D to Chapter 11 (pp. 202-206) to help you select a hazard. Evaluate the hazard and its associated risks, and then complete the Hazard Analysis and Risk Analysis Project form (click here to access this form).

To complete the Initial Risk Assessment and Post Control Risk Assessment sections, use the following codes based on the Risk Assessment Matrix in Table 11.10 (p.180) of the textbook:

SEVERITY: 1 – Catastrophic

2 – Critical

3 – Marginal

4 – Negligible PROBABILITY (Likelihood of Occurrence):

A – Frequent

B – Probable

C – Occasional

D – Remote

E – Improbable RISK CODE:

H – High

S – Serious

M – Medium

L – Low

All sections of the form must be completed. Note that the “Post Control Risk Assessment Measures” section reflects the risk assessment AFTER applying the additional control measures.

2. In a separate document of at least 500 words, explain the reasoning behind how you filled out each section of the form. Use references as needed to support the discussion. BOS 3651, Total Environmental Health and Safety Management

3 Upload both the completed form and the discussion document. Be sure that the discussion document is in APA format with a title page and a reference page.

*******************SEE ATTACHMENTS*******************

Manuele, Fred A.. Advanced Safety Management : Focusing on Z10 and Serious Injury Prevention (2). Somerset, US: John Wiley & Sons, Incorporated, 2014. ProQuest ebrary. Web. 17 February 2017.

"Get 15% discount on your first 3 orders with us"
Use the following coupon
FIRST15

Order Now