For a concrete slab on metal decking, which subcontractor should provide the edge forms at the…
For a concrete slab on metal decking, which subcontractor should provide the edge forms at the perimeter of the deck and at all deck penetrations, and which subcontractor should provide all hung forms for slab depressions?